fox: red 1x1 rib. (knitting)
fox ([personal profile] fox) wrote2008-08-16 09:00 pm

knitting update

Finished the Fawkes socks, finally.  Hurrah.  Toe-up socks with the leftovers from Fawkes and Bellatrix are also coming along nicely; red with purple toe and heel is past the heel and has half an inch of leg, and I'm holding off on any more of the leg because I have much less purple yarn so the length of the leg on the other sock is going to determine how long the leg on this one can be.  (It's why I did the red-foot one first, though, because once I've done the toe and the heel on the red-foot sock I could cut loose and use all the purple on the purple-foot one.)  Purple with red toe and heel is ready for the heel.

But I am pausing with those because my package from The Yarn & Fiber Company came today, so I cast on for Thuja socks for my dad, who's going for a minor surgery on Thursday.  He'll already be home when I get home for the beginning of my vacation on Friday, but I can give him handknit socks then; he will still appreciate them.  :-)  Thuja was designed with a sort of sport-weight yarn, 5.5 st/inch on size 6 needles, for a 44-stitch sock to fit men's size 9-11.  I believe my father's feet are bigger than this; also, I am using Smooshy sock yarn (in "Good Luck Jade"), which is 6.5-8 st/inch on size 1-3 needles.  So I'm using size 2 needles, where I expect to get about 8 stitches to the inch, and I cast on 80.  It, um, may not knit up as fast as the pattern would have us believe.

I've got about 3/4" of cuff done.  Onward!  (It's just that I hate doing cuffs.  Sigh.)

Post a comment in response:

(will be screened)
(will be screened if not validated)
If you don't have an account you can create one now.
HTML doesn't work in the subject.
More info about formatting

If you are unable to use this captcha for any reason, please contact us by email at support@dreamwidth.org